The foundation

A trench 80 cm deep, four courses of foundation blocks with reinforcement and concrete.

The foundation took just under two weeks in June. First a trench was dug, 80 cm deep. Then the foundation blocks went into place in four courses, with reinforcement and concrete in the cavities, and the inside was filled in.

  • The finished foundation on the lawn
    The finished foundation on the lawn
  • The dig in the garden, with buckets and a hosepipe
    The dig in the garden, with buckets and a hosepipe
  • The foundation blocks laid in a square in the trench
    The foundation blocks laid in a square in the trench
  • The foundation seen from the side
    The foundation seen from the side
  • The foundation filled in on the inside
    The foundation filled in on the inside